Locating and Controlling Utilities Before Demolition

A wall coming down onto a live gas line, an excavator cutting an energized feeder, a torch opening a pipe that still holds fuel — utilities kill demolition crews when nobody shut them off first. §1926.850(c) is blunt about it: all electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line, before demolition work is started.

Outside the building line matters. You isolate the service where it enters the property, not somewhere inside the structure you're about to tear apart.

Shut off, cap, or control — and notify

For every service entering the building, one of three things has to happen before demolition: shut it off, cap it, or otherwise control it. And in each case, any utility company involved must be notified in advance (§1926.850(c)). The utility often has to make the disconnection or verify it at their equipment.

  • Electric — de-energized and confirmed dead, not just breaker-off.
  • Gas — shut off and capped; purge lines that could still hold fuel.
  • Water, steam, sewer — isolated so lines don't flood or scald the work area.
  • Every affected utility company notified ahead of time.

Utilities that must stay live

Sometimes you need a service kept on during demolition — temporary power, water for dust control, a fire line. §1926.850(d) allows it, but those utilities have to be relocated as necessary and protected so the demolition work can't damage them and expose the crew.

That means marking them, routing them clear of the drop zones and equipment paths, and treating them as live hazards for the whole job — because they are.

Overhead and buried lines don't disappear

The service lines feeding the building aren't the only ones. Overhead power lines crossing the site and buried utilities under it stay energized and stay in the equipment's path. Keep cranes, excavators, and man-baskets clear of overhead lines, and locate buried utilities before any ground disturbance.

Electrical approach distances are covered in Electrical Safety and underground locating in Excavation Safety — the same rules apply here. The demolition point is simple: no line gets touched, cut, or pulled until it's been positively identified and controlled.

Attendance Form

Done with the Toolbox Talk?

Send the crew to the Toolbox Talk attendance form to submit this topic, presenter status, and any required hard-copy upload.

Open Attendance Form